Wednesday, February 26, 2020

Current Event Article 5 Essay Example | Topics and Well Written Essays - 250 words

Current Event Article 5 - Essay Example The article has rather taken a variable approach to find out the perception of subjects regarding corporate finance. The findings of the research show that the board size, family influence and small business growth etc. are some of the factors that have high impact on the small sized business in India (Gill, Biger2 and Mand). The authors have contributed in the existing literature of corporate finance. It should be noted that the literature regarding the corporate finance in Indian business cases have been limited. This research has taken a very systematic yet descriptive approach towards finding out the hypothesis. This research can be employed by companies of smaller board sizes that are trying to saturate their product in markets where extreme competition is being noted. The material has been backed up by relevant sources and peer reviewed journals. The facts and figures have been provided for the readers in a simplistic language. General readers can also be interested in the conclusion make by the

Monday, February 10, 2020

Hard Rock Cafe Essay Example | Topics and Well Written Essays - 500 words

Hard Rock Cafe - Essay Example A list of all activities required to complete the project (typically categorized within a work breadown structure), 2. The time (duration) that each activity will tae to completion, and 3. The dependencies between activities. With help of this CPM a manager can easily see the overral progress and which operations are to be crashed in order to complete a project in time. The total duration of the project is a sum of operations durations on the Critical path. Critical path is the sequence of activities which add up the longest overall duration. An additional parallel path through the network with the total durations shorter than the critical path is called a sub-critical or non-critical path (â€Å"Critical Path Method†, 2011). In the case of Rockfest, critical path is found using MS Project, Figure 1. In the first collumn there is the operations description, in the second, operations duration. There is Ganth diagram on the scheme with red marked crithical path. Therefore, the o verral duration of the project should be 23 weeks (the critical path duration). Crashing a project means shortening some operations to fullfill project’s time requirements. If activity B (Selection local printer) would take 5 weeks instead of planned 3 weeks we must crash some operations because activity B is on the Critical Path. The crashing time should be 5-3=2 weeks.